Extension Plumbing
We take water, heating, gas and drainage out into your new extension and tie it back into the house so the whole property still performs properly. First fix while the shell is open, second fix once it is plastered, and a new bathroom or kitchen fitted in the same run of work if you want one.


What's involved
From the first pipe run into the new shell to the last fixture connected, here is what extension plumbing usually covers.
First Fix Into the New Shell
Water, waste and heating pipework run through the extension before plastering and screeding, then capped and pressure tested.
Tying Into the Existing System
New pipework connected back into the existing supplies and drainage, with pressure, pipe sizing and falls checked first.
Heating the New Space
Radiators or underfloor heating extended into the extension, and honest advice on whether the boiler or cylinder needs to grow with it.
Bathrooms and Kitchens
Second fix sanitaryware, showers, sinks and appliances installed, connected and commissioned once the finishes are in.
Plumbing an extension so the whole house still works
An extension is rarely just a new room. It usually means another basin or two, often a shower, sometimes a kitchen moving into the new space, and always more demand on a heating and hot water system that was sized for the house as it was. The plumbing has to serve the new rooms and leave the old ones performing as well as they did before.
That is the part people underestimate. Running pipework into a new shell is straightforward; keeping the shower upstairs behaving once a second bathroom is drawing off the same main is where the thinking goes.
Extending a house means extending the system, not bolting a room onto it.
Before anything is run
We start with what you already have. That means checking the incoming mains, the pressure and flow actually available, the size of the existing pipework, what the boiler or cylinder can realistically carry, and where the existing drainage runs and at what depth.
Those findings shape the design. If the extension adds a bathroom, the hot water side may need to grow with it; if it adds a kitchen, the waste has to reach an existing run with enough fall to drain quietly. Far better to find that out with the plans on the table than with the floor already down.
First fix
Once the shell is up and watertight, the hidden work goes in. Hot and cold supplies are run on routes that stay clear of the structure, waste and soil pipes are set with proper falls and vented correctly, and heating flow and return lines are taken out to each radiator or underfloor manifold position.
Where a boiler is moving into the extension, or a hob is going into a new kitchen, the gas pipework is run at this stage. That work is domestic, and it is carried out under our Gas Safe registration, 568345.
Everything is then capped, pressure tested and left under pressure before the plasterers or screeders go anywhere near it.
More information
Things worth deciding early
- Whether the extension includes a bathroom, en-suite or utility, and where the soil connection will be
- Whether the existing boiler and cylinder can carry the extra demand
- Radiators or underfloor heating, since underfloor has to be planned before the screed goes down
- Where isolation valves and access points should sit for future maintenance
- Whether the kitchen is moving, and where its waste and supplies need to land
- How long the house can sit without water or heating while the new work is tied in
Tying in, and second fix
Connecting new to old normally means draining the system down for a spell. We tell you in advance when that will be and roughly what it involves, so you can plan around it rather than discover it on the day.
After plastering, tiling and units, we come back to fit and connect: sanitaryware, taps, showers, radiators, the cylinder, appliances and controls. The system is then refilled, vented, leak checked and balanced across the whole house rather than just the new part, because the original radiators share the same pump and the same flow.
A good tie-in is one you cannot find afterwards.
We are based in Woodingdean and cover Brighton, Hove, Worthing, Lewes, Shoreham-by-Sea, Haywards Heath, Seaford, Burgess Hill and surrounding Sussex towns. If your extension includes a bathroom, that is our speciality: we design and install them end to end.
Before you book
Straight answers to the questions homeowners ask us before an extension gets under way.
What is the difference between first fix and second fix on an extension?
Will an extension need a bigger boiler or hot water cylinder?
Can new pipework connect to the plumbing already in the house?
Will we lose water or heating while the new pipework is tied in?
Can you run gas pipework for a boiler or hob in the extension?
Can you fit the bathroom in the new extension too?
Which areas do you cover for extension plumbing?
How do we get a quote for extension plumbing?
Let's sort the plumbing for your extension
Tell us what the new space will contain and we'll talk you through how it should be plumbed.
Call 01273 911551